Westgroup Designs continues to secure DSA approval, bidding and construction as the campus project advances. These actions have resulted in a total of $6 Million in matching funds from the State of California reserved for the new construction of the Career Technical Education Facility on the Fillmore High School campus. 

Westgroup Design’s architectural solution will bring two new CTE buildings to the campus that will support Transportation (i.e. automotive) and Agriscience/Agricultural Mechanics pathways. The facilities will give students hands-on experience with state-of-the-art automotive diagnostics and repair equipment, greenhouse horticulture, and wood, metal and CNC fabrication.

“It’ll be a breath of fresh air onto the campus and into the community,” said Superintendent Dr. Adrian Palazuelos, and will allow the District “…the ability to realize the dream of creating the facility that our students deserve.”

As part of Fillmore USD’s facilities improvement efforts at Fillmore High School, Westgroup Designs is overhauling the campus electrical infrastructure to support future projects, such as a new Gymnasium, Performing Arts Center, and Administration, as well as modernization of existing classrooms.

In addition to work with Fillmore USD, Westgroup Designs is currently finishing construction of two High School campuses for Garden Grove USD that was made possible by $40 million of State AB 300 seismic replacement funds WD’s fast-track design solution secured. The construction is more than 85% complete, with the work phased to allow the campus to remain open without the need of interim housing.

See the District’s full press release here.

At 50-years-old, Los Alamitos High School needs new Science, Technology, Engineering and Math instruction spaces. Los Alamitos USD selected WD to deliver the learning environment for students and staff that will carry the campus into the future.

The new 83,000 sf STEM classroom building is being planned for the front of the school creating a new face for the campus and the Los Alamitos community, while improving long-term student safety and campus security. Additionally, the project will allow the campus to replace numerous portable classrooms with permanent classrooms (P2P) and allow for expanded Career Technical Education (CTE) pathways. The new building will include 14 science classrooms, 16 general classrooms, and career & technical education centers for engineering and robotics.

WD is working closely with the District to secure CTE state matching funds that will stretch their construction dollars and maximize the impact of the project to the sole high school within the district. The estimated $52.4-million project will be financed through sale of Measure G bonds, which was approved by voters last month.

Los Alamitos USD has a long-standing legacy of excellence in Academics, Athletics, Activities, and the Arts and strives to provide a meaningful standards-based curriculum that guarantees all students the opportunities and resources to attain the skills, knowledge, and values necessary to function as responsible and productive members of society.